Quick Start

Last updated: October 12th, 2026

Timesheets and Rates

Log the hours you worked on each project, week by week, and submit them for approval. Set the hourly rates that turn hours into money.

Projects › Timesheets · Projects › Rates
In simple words

A timesheet is one week of your hours. It is a table: each row is a project and task, each column a day, and you type the hours in the boxes. When the week is right you submit it. A manager then approves it, and only approved hours can be put on a client invoice.

Before you start

  • The projects you log on must exist and be set up with tasks: see Projects.
  • Your sign-in must be linked to an employee record (in HRMS). Otherwise the screen says Employee not found for this user. and you cannot log time. Ask your administrator to link you.
  • You cannot log time on a company holiday or on a day of approved leave (Cannot log time on a company holiday or approved leave.).

The weekly grid

Open Projects › Timesheets.

The Timesheet screen: week arrows and a Today button, the week 9 to 15 Nov 2026, the status Draft, Save Draft and Submit Week buttons, a grid with the days Monday to Sunday, a Total column, a Daily Total row and an Add Row button.
The weekly timesheet.
  • Week arrows and Today move to the previous or next week and back to this week. The week is shown as a date range, 9 Nov 2026 – 15 Nov 2026.
  • The status chip shows Draft, Submitted, Approved or Locked.
  • Save Draft and Submit Week are the two buttons.
  • The grid has Project / Task down the side, Mon to Sun across the top (with the date), a Total per row, a Daily Total row and the week total.
  • Add Row adds a project and task to the grid.

Log and submit your week

  1. Click Add Row. Pick the Project, then the Task, then Add. A project and task that is already in the grid is refused (This project/task combination already exists in the grid).
  2. Type the hours for each day in the row, for example 2.5.
  3. Click Save Draft to keep your work (Timesheet saved). If nothing changed it says No changes to save. You can come back and change the week as often as you like.
  4. When the week is final, click Submit Week and confirm Submit timesheet for this week? You will not be able to edit it after submission. You see Timesheet submitted.

After submitting, both buttons are off for that week. If a manager rejects it, it returns to Draft and you can correct and submit again.

Statuses

StatusMeaning
DraftYou are still filling it in, or it was rejected and came back.
SubmittedSent. Waiting for a manager (it is shown as Pending on the Approvals screen).
ApprovedA manager approved it. These hours can be invoiced.
LockedClosed for changes.

Rates

Open Projects › Rates. It lists the default rates that apply when a team member logs time. A project can override them on its Team tab.

Billing Rates: the explanation that default rates apply when team members log time, the columns Team Member, Billing Rate per hour and Cost Rate per hour, and the empty message asking to add team members to projects first.
The Billing Rates screen (empty until a project has team members).
  • Columns: Team Member, Billing Rate (₹/hr) (what you charge the client) and Cost Rate (₹/hr) (what the hour costs you). The difference is your margin.
  • Click the pencil, type the new rates, then the tick to save (Billing rate updated) or the cross to cancel. A negative rate is refused (Rates cannot be negative).
  • With no team members it says No billing rates configured yet. Add team members to projects first, then their rates will appear here.
Which rate is used?

It depends on the project's billing method: Task Hours uses the task's rate, Staff Hours the member's bill rate, Project Hours the project's one hourly rate, Fixed Price no rate. See Projects.

Worked example

  1. Your manager has put you on the project Website redesign with the task Design.
  2. Open Projects › Timesheets. Click Add Row, choose Website redesign and Design, click Add.
  3. Type 3, 4, 2.5 under Mon, Tue, Wed. Save Draft each evening.
  4. On Friday click Submit Week, confirm. The chip says Submitted.
  5. Your manager approves; the chip says Approved and the hours appear on the project's Time Entries tab.

Good to know

  • One timesheet per person per week.
  • Hours are in hours. Type 1.5 for an hour and a half.
  • Submitted weeks cannot be edited. Ask the manager to reject it if you made a mistake.