Make finished goods from raw materials. Write the recipe once (a bill of materials), run it as often as you like (a work order), and see how the real use compared with the plan.
A bicycle maker buys frames, wheel sets and cables and sells bicycles. To keep stock and cost right, Kanak Books needs to know that one bicycle uses 1 frame, 2 wheel sets and 1 cable set. That list is the bill of materials (BOM), the recipe. When you actually build 10 bicycles you make a work order: Kanak Books takes the parts out of stock and, when you finish, puts the bicycles in. If you used one frame more than planned, it shows the variance.
Open Items › Manufacturing. The screen has three tabs:
Plan and permissions. Manufacturing is a Pro plan feature. What each user can do depends on separate manufacturing permissions: view (see the screens), create work orders, manage BOMs (every BOM button), edit (production expenses and Update Quantity), finish and cancel. A button you do not have the permission for is hidden.
The costs in this module follow your stock costing method (Items) and use manual production expenses only: there is no labour or machine rate, no scrap percentage and no part-finish. A work order is finished in one step.
Open BOM Management.

| Status | Meaning |
|---|---|
| Draft | Being prepared. You can edit everything. It cannot be used for a work order. |
| Active | The recipe in use. Work orders take their components from it. It is locked (This BOM is currently Active. Deactivate it first to edit components and byproducts.): to change the components, Deactivate it (it goes back to Draft) or make a new version. An Active BOM cannot be deleted. An item has only one Active BOM at a time. |
| Superseded | The old Active version that was replaced when you activated a newer one (Set as Active or Activate Now). It is kept for history, has no buttons and shows only under the All filter. |
| Obsolete | A retired version that cannot be edited (This BOM is Obsolete and cannot be edited.); its screen has a Back button instead of Cancel. The screens have no button that sets it. |
Rules checked when you save. At least one component is required (At least one component is required.). A BOM cannot contain the item it makes, directly or through a sub-assembly (it is refused). A component can itself be a made item with its own Active BOM: a multi-level BOM is worked out down to the raw materials.
Click an item to see its versions. Each version is a panel: click it to open.

Use New BOM (pick the item), New BOM Version, Create New Version or Clone. Clone and Create New Version start from the old recipe: the version number goes up (1.0 to 1.1) and the notes say Cloned from v1.0.

| Field | What to enter |
|---|---|
| 1 Version | Your own label, for example 1.0 or 2024-A. |
| 2 Effective Date | When this recipe starts to apply. Optional. |
| Notes | Why this version exists. Optional. |
| 3 Save As | Draft keeps it for later. Activate Now saves it and makes it the Active one at once. |
| Components at least one | For each row: click the Item box to search and pick the raw material, type the Quantity needed for one unit of the product. The minus icon removes a row (not the last one). Add Component adds a row. |
| 4 Critical | A tick mark used by restaurants (when checked, this dish is marked unsellable if this ingredient runs out). Leave it clear for factory recipes. |
| Byproducts (optional) | Extra things the process yields, such as scrap you can sell. Add Byproduct, then pick the item, the Quantity and the Recovery Rate (required, a number; its credit is set against the cost when the work order finishes). |
Click Save BOM (BOM created successfully. or BOM updated successfully.). If a required box is empty you see Please fill in all required fields.
Open Production Work Orders.


What creating a work order does. It does not issue the parts yet. It reserves the components (so they show as committed to production and cannot be promised twice), shows the finished item as ordered, and posts an accounting entry that moves the planned material cost from Inventory to Inventory WIP (work in progress). The parts leave stock when you finish, at the quantity you actually used.
If your stock setting Block production from expired material is on (Settings › Items & Stock › Batches and expiry), creating the order is refused when the earliest batch of a component has expired.
When a component is short and the box is not ticked, a red Low Stock Warning lists Item, Current Stock and Required with two buttons: Allow Negative Stock & Create (create it anyway) and Cancel.
In the current version the Component Stock table may list only the first component and show Available 0.00 for it even when stock exists. The Work Order screen, opened afterwards, lists all components. Check the real stock in Items › Godowns.
Click the product name in the list. The breadcrumb Production Work Orders › product takes you back.

The screen can show Date: - and Material Cost - for a work order that the list shows with a date and cost.
This is by design. The cost of the finished goods keeps the material variance only up to a tolerance, 5 percent of the planned component cost unless you change it (Settings › Items & Stock › Show more settings › Manufacturing variance › Manufacturing variance tolerance (%), 0 to 100, Pro plan). A variance beyond the tolerance, more or less than planned, is not added to the goods: it is booked to the Manufacturing Variance expense account. In the example below the frames go from 2 planned to 3 used, which is over 5 percent, so the extra frame is expensed and the Net Production Cost is lower than material plus expenses.
When the goods are made, click Finish.

The work order becomes Finished, the finished goods enter stock, and the actual quantities and variance are recorded. In accounts: the components leave stock at the quantity you used; the planned cost leaves Inventory WIP and enters Inventory (finished goods); the production expenses are credited to Manufacturing Expenses; any variance beyond the tolerance goes to Manufacturing Variance; and by-products are received into stock, reducing the cost of the finished goods.

Choose a date range and click Load. The range is matched against the work order's start date, and only Finished runs of an item are listed. Each finished run is a row: Finish Date, Product (click to open the work order), Qty, Planned Cost, Actual Cost and Variance (actual minus planned: a positive figure means the run cost more than planned). The table pages by 10, 25 or 50 when there are more rows than one page. With nothing: No finished work orders found and Finish a work order to see material cost variance data here.