Quick Start

Last updated: October 12th, 2026

Manufacturing: BOMs and Work Orders

Make finished goods from raw materials. Write the recipe once (a bill of materials), run it as often as you like (a work order), and see how the real use compared with the plan.

Items › Manufacturing
In simple words

A bicycle maker buys frames, wheel sets and cables and sells bicycles. To keep stock and cost right, Kanak Books needs to know that one bicycle uses 1 frame, 2 wheel sets and 1 cable set. That list is the bill of materials (BOM), the recipe. When you actually build 10 bicycles you make a work order: Kanak Books takes the parts out of stock and, when you finish, puts the bicycles in. If you used one frame more than planned, it shows the variance.

Diagram: 1 the BOM lists the components per unit; 2 a work order for a quantity plans the components and is In Progress; 3 Finish records the actual quantities and by-products and shows variance and net cost.
From recipe to finished goods.

The three tabs

Open Items › Manufacturing. The screen has three tabs:

  • Production Work Orders: the runs you have made and want to make.
  • BOM Management: the recipes.
  • Variance Report: planned against actual cost of finished runs.

Plan and permissions. Manufacturing is a Pro plan feature. What each user can do depends on separate manufacturing permissions: view (see the screens), create work orders, manage BOMs (every BOM button), edit (production expenses and Update Quantity), finish and cancel. A button you do not have the permission for is hidden.

The costs in this module follow your stock costing method (Items) and use manual production expenses only: there is no labour or machine rate, no scrap percentage and no part-finish. A work order is finished in one step.

Bills of materials

Open BOM Management.

BOM Management tab: a Status filter, Refresh and New BOM buttons, and a table with Item, Version, Status, Components and Effective Date.
BOM Management.
  • Status filter: All, Draft, Active, Obsolete (it applies as soon as you choose; there is no Load button here). Refresh reloads. New BOM starts a recipe for an item.
  • Columns: Item (click it, or anywhere on the row, to open its versions), Version, Status, Components (how many), Effective Date. The table pages by 10, 20 or 50.
  • With none: No BOMs found and the line A Bill of Materials defines the components and quantities required to manufacture one unit of a product.
StatusMeaning
DraftBeing prepared. You can edit everything. It cannot be used for a work order.
ActiveThe recipe in use. Work orders take their components from it. It is locked (This BOM is currently Active. Deactivate it first to edit components and byproducts.): to change the components, Deactivate it (it goes back to Draft) or make a new version. An Active BOM cannot be deleted. An item has only one Active BOM at a time.
SupersededThe old Active version that was replaced when you activated a newer one (Set as Active or Activate Now). It is kept for history, has no buttons and shows only under the All filter.
ObsoleteA retired version that cannot be edited (This BOM is Obsolete and cannot be edited.); its screen has a Back button instead of Cancel. The screens have no button that sets it.

Rules checked when you save. At least one component is required (At least one component is required.). A BOM cannot contain the item it makes, directly or through a sub-assembly (it is refused). A component can itself be a made item with its own Active BOM: a multi-level BOM is worked out down to the raw materials.

Click an item to see its versions. Each version is a panel: click it to open.

The BOM versions of Assembled Bicycle. Version V1.0 is Active; opened, it shows the components Steel Frame, Wheel Set, Brake Cable Set with quantities and a Critical Ingredient column, and the buttons Deactivate, Clone and Create New Version.
One version, opened. 1 status, 2 Deactivate, 3 Clone, 4 Create New Version.
  • The header shows the version (V1.0), the status badge and the Effective date. Notes appear in italics.
  • Components: item and quantity per unit, and a warning icon for Critical Ingredient. Byproducts: item, quantity and recovery rate.
  • The page heading says N BOM version(s) found.
  • Buttons depend on the status and need the manage-BOM permission. Draft: Set as Active, Edit, Clone, Delete (a box asks Delete this BOM? This cannot be undone.). Active: Deactivate, Clone, Create New Version. Obsolete: Clone. Superseded: none.
  • Edit on a Draft opens the same screen as New BOM with the title Edit BOM; after Save or Cancel you return to that item's versions. Keyboard: Alt+S saves and Esc cancels.
  • With no BOM for the item the screen says No BOMs found for this item. Create the first version to get started.

Create or clone a BOM

Use New BOM (pick the item), New BOM Version, Create New Version or Clone. Clone and Create New Version start from the old recipe: the version number goes up (1.0 to 1.1) and the notes say Cloned from v1.0.

New BOM for Assembled Bicycle with Version, Effective Date, Notes, Save As Draft or Activate Now, and a Components list with Item, Quantity and a Critical checkbox for each row.
A cloned BOM. 1 Version, 2 Effective Date, 3 Save As, 4 Critical, 5 Add Component.
FieldWhat to enter
1 VersionYour own label, for example 1.0 or 2024-A.
2 Effective DateWhen this recipe starts to apply. Optional.
NotesWhy this version exists. Optional.
3 Save AsDraft keeps it for later. Activate Now saves it and makes it the Active one at once.
Components at least oneFor each row: click the Item box to search and pick the raw material, type the Quantity needed for one unit of the product. The minus icon removes a row (not the last one). Add Component adds a row.
4 CriticalA tick mark used by restaurants (when checked, this dish is marked unsellable if this ingredient runs out). Leave it clear for factory recipes.
Byproducts (optional)Extra things the process yields, such as scrap you can sell. Add Byproduct, then pick the item, the Quantity and the Recovery Rate (required, a number; its credit is set against the cost when the work order finishes).

Click Save BOM (BOM created successfully. or BOM updated successfully.). If a required box is empty you see Please fill in all required fields.

Work orders

Open Production Work Orders.

Production Work Orders: From Date, To Date and Status filters, a Load button and a New Work Order button, and a table with Date, Product, Qty, Material Cost and Status.
Work orders. 1 From Date, 2 Status, 3 Load, 4 New Work Order.
  • Filters: 1From Date and To Date, 2Status (All, In Progress, Finished). Click 3Load to apply them (unlike the BOM tab, these filters wait for Load).
  • 4New Work Order starts a run.
  • Columns: Date, Product (click to open), Qty, Material Cost, Status (In Progress amber, Finished blue). The table pages by 10, 25 or 50.
  • With none, the screen says No work orders found.

Create a work order

New Work Order with the item Assembled Bicycle chosen, its Active BOM v1.0 with 3 components, a Component Stock table, a Component Overrides panel, the Quantity 2 and a Date and the Allow negative stock checkbox.
New Work Order.
  1. 1 Choose the Item (the list shows each item's SKU). Only items that have an Active BOM are listed. If you still get No active BOM found for this item. Please set an active BOM before creating a work order., activate a BOM first.
  2. 2 The Active BOM line shows the version and the number of components. The small arrow opens the BOM. If the item has none, a warning says This item has no active BOM — start by creating one in BOM Management.
  3. 3Component Stock lists each component with Per Unit, Required (per unit times your quantity) and Available. A shortage shows red with a warning sign.
  4. Component Overrides (optional, edit to use non-BOM quantities) lists Component, BOM Qty/Unit and Total Qty to Reserve. The boxes start filled with the recipe quantity times your quantity; only a row you change is sent as an override.
  5. 4 Type the Quantity to produce required.
  6. 5Date is optional.
  7. Allow negative stock: tick it only when you know the parts exist but their purchase bills are not entered yet.
  8. Click Create Work Order. You see Work order created successfully. (Keyboard: Alt+S saves, Esc cancels.)

What creating a work order does. It does not issue the parts yet. It reserves the components (so they show as committed to production and cannot be promised twice), shows the finished item as ordered, and posts an accounting entry that moves the planned material cost from Inventory to Inventory WIP (work in progress). The parts leave stock when you finish, at the quantity you actually used.

If your stock setting Block production from expired material is on (Settings › Items & Stock › Batches and expiry), creating the order is refused when the earliest batch of a component has expired.

When a component is short and the box is not ticked, a red Low Stock Warning lists Item, Current Stock and Required with two buttons: Allow Negative Stock & Create (create it anyway) and Cancel.

Component Stock panel

In the current version the Component Stock table may list only the first component and show Available 0.00 for it even when stock exists. The Work Order screen, opened afterwards, lists all components. Check the real stock in Items › Godowns.

Open a work order

Click the product name in the list. The breadcrumb Production Work Orders › product takes you back.

A finished work order: Cost Summary with Material Cost 10560.00, Production Expenses 500.00 and Net Production Cost 9698.00, and a BOM Components table with Planned Qty, Actual Qty and Variance (Steel Frame 2 planned, 3 actual, variance 1).
A finished work order.
  • The title, a status badge (In Progress or Finished), the date and the Quantity. An unknown work order says Work order not found.
  • Cost Summary: Material Cost, + Production Expenses, − Byproduct Recovery when there is one, and, when finished, Net Production Cost.
  • BOM Components (the heading shows the BOM version used, for example v1.0): Planned Qty, Actual Qty (a dash until you finish) and Variance, with four decimals: red when more was used, green when less.
  • Production Expenses (while In Progress): add costs that are not materials, such as labour or power: type a Description and Amount and click Add. The pencil edits a line (tick saves, cross cancels), the bin removes it (Remove this expense?). A description is required and the amount must be at least 0.01. This card needs the edit permission.
  • Buttons at the bottom: Update Quantity (asks Enter the new quantity to produce.; it re-plans the components and by-products and re-checks stock only when you increase it), Finish, Cancel Work Order (This permanently removes the work order. Inventory will be restored. Continue?). All three work only while the order is In Progress; a finished order has no buttons and cannot be finished twice.
Known issues

The screen can show Date: - and Material Cost - for a work order that the list shows with a date and cost.

Why Net Production Cost can be less than material plus expenses

This is by design. The cost of the finished goods keeps the material variance only up to a tolerance, 5 percent of the planned component cost unless you change it (Settings › Items & Stock › Show more settings › Manufacturing variance › Manufacturing variance tolerance (%), 0 to 100, Pro plan). A variance beyond the tolerance, more or less than planned, is not added to the goods: it is booked to the Manufacturing Variance expense account. In the example below the frames go from 2 planned to 3 used, which is over 5 percent, so the extra frame is expensed and the Net Production Cost is lower than material plus expenses.

Finish a work order

When the goods are made, click Finish.

The Finish Work Order box with Actual Materials Used (Planned, Actual Qty and a deviation note for each component), a Fill from Planned button, by-product boxes and Notes.
The Finish Work Order box.
  1. Actual Materials Used (columns Component, Planned, Actual Qty, Note (optional)): the boxes already hold the planned figures; type the quantity really used where it differed. Fill from Planned resets them. Add a note (placeholder Reason for deviation) such as One frame damaged for each difference. A component planned at 0 cannot be given a quantity.
  2. By-Products Received (when the recipe has any): type the Qty Received of each; the Expected figure is shown beside it. A by-product with 0 received is not added to stock.
  3. Notes (optional), then Finish.

The work order becomes Finished, the finished goods enter stock, and the actual quantities and variance are recorded. In accounts: the components leave stock at the quantity you used; the planned cost leaves Inventory WIP and enters Inventory (finished goods); the production expenses are credited to Manufacturing Expenses; any variance beyond the tolerance goes to Manufacturing Variance; and by-products are received into stock, reducing the cost of the finished goods.

Variance Report

Variance Report tab: From Date and To Date filters with Load, and a table with Finish Date, Product, Qty, Planned Cost, Actual Cost and Variance.
Variance Report.

Choose a date range and click Load. The range is matched against the work order's start date, and only Finished runs of an item are listed. Each finished run is a row: Finish Date, Product (click to open the work order), Qty, Planned Cost, Actual Cost and Variance (actual minus planned: a positive figure means the run cost more than planned). The table pages by 10, 25 or 50 when there are more rows than one page. With nothing: No finished work orders found and Finish a work order to see material cost variance data here.

Worked example

  1. Make sure frames, wheel sets and cable sets are items with stock, and Assembled Bicycle is an item.
  2. In BOM Management click New BOM, pick Assembled Bicycle, version 1.0, add 1 frame, 2 wheel sets, 1 cable set, Activate Now, Save BOM.
  3. In Production Work Orders click New Work Order, choose Assembled Bicycle, quantity 2, Create Work Order.
  4. Open it, add a production expense Assembly labour 500, Add.
  5. After building, click Finish, Fill from Planned, change the frames to 3 with the note One frame damaged, Finish.
  6. Open Variance Report and look at the run.

Good to know

  • Cancel restores stock. A cancelled work order (In Progress only) is removed for good, its reservations are released and its work-in-progress entry is reversed. It is all or nothing: if any part fails nothing is cancelled.
  • One step to finish. There is no partial completion; finish once with the actual quantities.
  • Manufacturing reports. Work Orders, Production Cost, BOM Utilization, Component Consumption, Production Performance and Byproduct Recovery reports are in Reports › Inventory (All Reports); they are Pro plan reports.
  • Item costing. See Items for FIFO and average costing, which decide the cost of the parts used.