Quick Start

Last updated: October 12th, 2026

Job Work: Orders, Projects and ITC-04

Send your material to an outside job worker for processing, get it back, pay the processing charges and keep the GST (ITC-04) record, all in one place.

Job Work › Dashboard · Projects · Orders · Reports
In simple words

Sometimes a step of your work is done by someone else: you give a workshop your steel frames for powder coating and they give them back coated, for a fee. The frames stay yours while they are at the workshop. That is job work, and the workshop is the job worker. Because the goods leave your premises, the GST law wants a record (a delivery challan when they leave, and a half-yearly return called ITC-04) and wants them back within a time limit: one year for materials, three years for capital goods. This module keeps all of that for you.

Diagram: material goes from your godown to the job worker on a challan (Dispatch) and processed goods come back to your godown (Receive). The order moves through Draft, Approved, Dispatched, Partially Received, Received and Completed. Charges and wastage can be recorded after Dispatch.
The round trip of your material and the steps of an order.

Switch it on

  • Pro plan. The Job Work menu entry is shown on the Pro plan.
  • In Settings › Items & Stock, Features on this page, turn on Job work (Send or receive material for processing). See Stock Count for a picture of that card.
  • Create your job workers as vendors in Contacts. The order form picks them from your vendor list.
  • The Job Work entry then appears in the main menu. It has four tabs: Dashboard, Projects, Orders, Reports.

Dashboard

The Job Work dashboard with New Order, New Project, Pending Report and All Orders buttons, four counters, Recent Activity, Top Job Workers and Deadline Alerts.
The Job Work dashboard.
  • New Order, New Project, Pending Report and All Orders are shortcuts.
  • Four counters:Total Active Orders, Material at Job Workers (value), Approaching Deadlines, Breached Deadlines.
  • Recent Activity: the latest dispatches, receipts and charges with date, type, order, worker and amount.
  • Top Job Workers: ranked by the value of material at each worker, with their number of active orders.
  • Deadline Alerts: dispatched orders with a colour for the time left: green On Track (more than 6 months), blue Upcoming (2 to 6 months), amber Due Soon (1 to 2 months), red Breached (under 1 month or overdue). Full Report opens the Aging report.
Known issues

In the current version the four counter cards always show 0, because the screen asks the server for figures under names the server does not use (D-1173), and the worker's name can show - even when an order is dispatched. The orders and reports below hold the real figures. The four cards are clickable: Total Active Orders opens Orders, Material at Job Workers opens Pending, and the two deadline cards open Aging. Recent Activity (Date, Type, Order #, Job Worker, Amount) types are Dispatch, Receipt, Charges, Wastage and New Order; Deadline Alerts (Order #, Job Worker, Item, Dispatched, Deadline, Days Remaining as Overdue Nd, Status) show at most 20 rows. Empty states: No recent activity, No job workers yet, No deadline alerts.

Orders

The Orders tab: a search box, a Status filter, New Order button and a table with Order number, Date, Job Worker, Processing Type, Status, Material Cost and Net Cost.
The order list.
  • Search by order number or job worker, a Status filter (All, Draft, Approved, Dispatched, Partially Received, Received, Completed, Cancelled) and New Order.
  • Columns: Order# (JWO-00004), Date, Job Worker, Processing Type, Status (coloured), Material Cost, Net Cost. The eye opens the order; a pencil (for drafts) edits it.
  • With none: No job work orders found.

Create an order

Click New Order.

The top of the New Job Work Order form: Job Worker, Processing Type (Processing or Manufacturing), Date, Expected Return Date and Nature of Processing.
Order details.
FieldWhat to enter
Job Worker requiredType at least two letters, in small letters, of the vendor's name and pick one.
Processing Type requiredProcessing (same item): the same item comes back processed (frames in, coated frames out). Manufacturing (BOM-based): the job worker makes a different item from your materials, using a bill of materials; see below.
Date requiredThe order date.
Expected Return DateThe date you expect the goods back. It drives the Due Date and the deadline alerts.
Nature of ProcessingA few words for the challan and ITC-04, for example Powder coating.
NotesInternal notes.
Link to ProjectOptional: tie this order to a job work project as one of its stages.
The lower part of the order form: Nature of Processing, Notes, Link to Project, a Line Items table with Item, Quantity, Rate and Amount, Add Row, the total and the Capital Goods Classification tick box.
Line items and the capital-goods box. The markers 5 to 9 here point at Nature of Processing, Link to Project, Item, Quantity and Rate.
  • Line Items (processing): for each line search the Item (small letters), type the Quantity to send and the Rate (your cost of the material per unit). Amount and the Total are worked out. Add Row adds a line; the cross removes one.
  • BOM Selection (manufacturing): choose the BOM, then the Output Item is shown and you type the Output Quantity. The BOM Components table shows the material needed per unit. See Manufacturing for BOMs.
  • Capital Goods Classification: tick This is a capital good (3-year return deadline) when you send machinery or tools. The rule is that capital goods sent for job work must be returned within 3 years (Rule 45); other material within 1 year. Kanak Books sets the legal deadline when you first dispatch: dispatch date plus 365 days, or plus 1,095 days for a capital good. This deadline, not the Expected Return Date, drives the Aging report, the dashboard and the Pending report. Known problem: in the current version the tick is not saved, so a capital good still gets 365 days (D-1174); check the deadline in the Aging report.

Click Save. You see Job work order created. and the order is a Draft.

The life of an order

Open an order (the eye icon). The top shows its status and the buttons that fit that status.

A draft job work order JWO-00007: Order Details, Line Items with Ordered, Dispatched, Received, Wasted, Rate and Amount columns, the Cost Summary and the buttons Edit, Approve and Cancel.
A draft order.
StatusButtonsWhat happens
DraftEdit, Approve, CancelNothing has moved. Approve asks you to confirm and makes it ready to dispatch.
ApprovedDispatch, CancelDispatch sends the material (below).
DispatchedReceive, Send to Another Job Worker, Record Charges, Record Wastage, CancelThe goods are at the job worker.
Partially ReceivedReceive, Record Charges, Record Wastage, CancelSome of the goods are back.
ReceivedRecord Charges, Record Wastage, Complete, CancelEverything is back. Complete closes the order.
CompletedRecord ChargesFinal. Complete cannot be undone.
CancellednoneThe order is dead. Cancel is available until the order is completed.

Dispatch

The Dispatch to Job Worker box with the Source Godown Main Warehouse and Qty to Dispatch 5 of 5.00 remaining.
Dispatch to Job Worker.

Choose the Source Godown (where the material is) and type the Qty to Dispatch for each line (up to what remains). Click Dispatch. Kanak Books takes the stock out of that godown and makes a delivery challan (shown under Dispatches as DC #6). The order becomes Dispatched and the Material Cost of the order is booked.

Receive

The Receive from Job Worker box with the Target Godown and Qty Received 3 of 5.00 pending.
Receive from Job Worker.

Choose the Target Godown where the goods come back and type the Qty Received for each line (up to what is still pending). Receiving part of it makes the order Partially Received; receiving it all makes it Received. When everything is received the box says All dispatched quantities have already been received.

Send to Another Job Worker is the alternative to receiving: the goods go straight from this job worker to a second one (a destination job worker and a quantity for each line, up to what is at the first worker). It is reported in ITC-04 table 5(B).

Record Charges

The Record Job Work Charges box with a Bill drop-down and the message No bills from this job worker yet. Enter the bill in Purchases first.
Record Job Work Charges.

The job worker sends you a bill for the processing. Enter that bill in Purchases first, then open Record Charges, pick the bill and click Record Charges. The bill's lines are moved into the order's Processing Cost. With no bill it says No bills from this job worker yet. Enter the bill in Purchases first.

Record Wastage

The Record Wastage box with Item, Wastage Type, Quantity, Rate per Unit, Scrap Recovery Value and Notes.
Record Wastage.
  • Item (one of the order's items), Wastage Type: Process Loss, Damage or Scrap (Recoverable).
  • Quantity and Rate per Unit (required), Scrap Recovery Value (what the scrap is worth) and Notes.
  • The order's cost box gets a Wastage Cost line and, when you give a scrap value, a Scrap Recovery line that reduces the net cost.

Cost and timeline

A Received order: Cost Summary with Material Cost 750.00, Processing Cost 0.00, Wastage Cost 150.00 and Net Cost 900.00, the Dispatches table with DC number 6 and the Activity Timeline Created, Approved, Dispatched, Received, Completed.
A received order with its cost summary, dispatch and timeline.
  • Cost Summary: Material Cost, Processing Cost, Wastage Cost, Scrap Recovery (a minus line), and Net Cost.
  • Dispatches lists each challan with its date; Charges and Wastage Records list what you recorded.
  • Activity Timeline: Created, Approved, Dispatched, Received, Completed. The current step is marked.
Known issues

The order screen may keep the Wasted column at - and show no wastage list after you record a wastage, even though the Wastage Cost line is right. The quantities are not cross-checked: dispatched, received and wasted together can add up to more than you sent. Check them yourself.

Projects

A project groups the orders of one job, for example the coating and the assembly of a batch, as stages, with one cost total.

The Projects tab with a search box, Status filter, New Project button and a table with Project number, Date, Description, Status, Stages and Net Cost.
The project list.

Columns: Project# (JWP-00001), Date, Description, Status, Stages (completed/total) and Net Cost.

The New Job Work Project form with Description, Date, Expected Completion Date, Tag and Notes.
New project.

The New Project form (card Project Details) has Description and Date (required: Description is required, Date is required), Expected Completion Date, a Tag (a drop-down of your existing tags, with None) and Notes. Projects are numbered JWP-00001. The project list searches by project number or description (Project number, description...), filters by Status and pages by 10, 25 or 50. A project opens with Edit, Delete and Back; Edit and Delete show only while the project is a Draft. Delete asks Delete project "JWP-…"? This cannot be undone. and is refused if orders are linked to it. A project that is completed or cancelled cannot be edited. Approving the first linked order moves a Draft project to Open; completing orders moves it to Completed when all its stages are done. Empty states: No job work projects found and, on the detail, No stages yet (Link job work orders to this project to track stages.).

Known problem on the current build

The project list and detail show the order status names (for example Approved or Partially Received) instead of the project's own states, the Completed filter picks projects that are still In Progress, and stage numbers are not sent from the order form so the next-stage auto-approve does not run (D-1176).

A project page with Project Information, the Stages (Job Work Orders) card and the Project Cost Summary with material, processing, wastage and net cost.
A project.

The project page shows the details, the Stages (Job Work Orders) with stage number, order, job worker, status and net cost (View Order), and the Project Cost Summary: Material Cost, Processing Charges, Wastage / Loss and Net Project Cost. You add a stage by choosing the project in Link to Project on an order.

Reports

The Reports tab has five reports, each with a View button (and Export where shown).

The Pending report, Material at Job Workers, with an As of Date box and View and Export buttons.
Pending: Material at Job Workers.
ReportWhat it shows
Pending (Material at Job Workers)Material still at job workers on a date (As of Date): order, job worker, item, Qty Pending, rate, value, dispatch date and deadline, with a total. Filter by job worker.
AgingDispatched orders by time left to the legal deadline. The data uses these bands: Breached (past the deadline), Red (up to 30 days left), Orange (up to 60), Yellow (up to 180), Green (more). The page legend and filter on the current build say On Track (>7 days), Due Soon (3–7 days), Critical (0–3 days) and Overdue, which do not match (D-1175). Columns: order, worker, dispatch date, deadline, days remaining, material value, status. It has no Export button.
Cost AnalysisPer order: material, processing, wastage, scrap recovery and net cost with totals. Filter by date, job worker and project.
RegisterA dated list of entries (dispatches, receipts, charges, wastage) with order, worker and amount. Filter by date, worker and type.
ITC-04The GST return data. See below.
The Cost Analysis report: one row per order with Material, Processing, Wastage, Scrap Recovery and Net Cost, and a Totals row.
Cost Analysis.
Known issues

In the current version the Pending report can be empty while an order is still dispatched, the job worker's name can show - in several reports, and the Register's Type and Description can be blank. Use the order list and order screens as the source of truth.

ITC-04

Form ITC-04 lists the goods you sent to job workers and received back. It is filed half-yearly (or yearly for small businesses).

The ITC-04 report: Periodicity Half-Yearly or Annual, the half H1 (Apr to Sep) or H2 (Oct to Mar), the Year, Export as Portal JSON or Excel, View and Export buttons, a Summary with Total Value Sent, Received and Pending at Job Worker, and Table 4A.
The ITC-04 report.
  1. Choose Periodicity: Half-Yearly or Annual.
  2. For half-yearly choose the Half (H1 (Apr–Sep) or H2 (Oct–Mar)) and the Year.
  3. Click View. The Summary shows Total Value Sent, Total Value Received and Pending at Job Worker.
  4. Choose Export asPortal JSON (upload) for the GST portal or Excel (review) for checking, then click Export.
TableWhat it lists
Table 4A, Goods Sent to Job WorkerEach challan: challan number, date, job worker, description of goods, quantity, value, job worker's GSTIN.
Table 4B, Goods Received BackEach receipt, with the loss or waste quantity. In the portal JSON this table is written as table5A.
Table 5(B), Received from a Different Job WorkerGoods sent onward from one job worker to another.
Table 5(C), Direct Supply from Job Worker's PremisesNot supported yet: goods must be received back or sent onward. It is always empty in the export.
Amendment LogYour own record of corrections made to an already-filed period (Amendment Log (Internal — Not a Form ITC-04 Table)). It is not a part of the form, and this screen has no way to record an amendment.
Check the table before you file

The Portal JSON is a draft: it does not yet fill every field the GST portal's schema calls for (for example the goods type, unit code and tax split). Treat the Excel file as the reviewed copy and compare with your challans before you upload. A job worker with no GSTIN in its contact tax details is exported as URP or blank. The year list goes back five years; the half and year start from today's date. The ITC-04 title bar is ITC-04 — Job Work Data, with an information icon after Export. Table 4A leaves out orders whose challan was voided by a cancellation. Empty states: No goods dispatched this period, No goods received this period, No job-worker-to-job-worker movement this period, No direct supply from job worker premises this period, No amendments recorded this period.

In the current version a dispatch row can show - for the date, value and GSTIN even though the summary has the value. Compare the table with your challans before you upload.

Worked example

  1. Turn on Job work in settings and add Olivia Bishop as a vendor.
  2. Job Work › Orders › New Order: job worker Olivia Bishop, Processing, date today, expected return a month away, nature Powder coating, line: Steel Frame quantity 5 rate 150. Save (₹750).
  3. Open the order, Approve, then Dispatch 5 from Main Warehouse. A challan is created; print it with the goods.
  4. When 3 frames come back: Receive 3 into Main Warehouse (status Partially Received). Later receive the last 2.
  5. Enter the worker's bill in Purchases, then Record Charges and pick it.
  6. Complete the order. At half-year end open Reports › ITC-04, View, Export.

Good to know

  • Deadlines. The legal return deadline is set at the first dispatch: one year, or three years for capital goods (see the known problem above). The Expected Return Date you type is only the order's Due Date and drives Days Remaining on the order screen, so the two can differ.
  • Report screens. A button row (Pending, Aging, Cost Analysis, Register, ITC-04) switches between the reports. Pending: filters Job Worker (All Workers) and As of Date, buttons View and Export. Cost Analysis: Date From, Date To, Job Worker and Project (All Projects); columns Order#, Job Worker, Material, Processing, Wastage, Scrap Recovery and Net Cost, with a Totals row; no Export. Register: Date From, Date To, Job Worker and Type (All, Dispatch, Receive, Charges, Wastage); columns Date, Type, Order#, Job Worker, Description, Amount; View and Export. Empty states: No pending material found, No aging data found, No cost data found, No register entries found.
  • Permissions.View job work (orders, projects, reports), Create job work (create and edit orders and projects), Manage job work (approve, dispatch, receive, charges, wastage, complete, cancel). Job Work is a Pro plan feature and needs the Job work setting on.
  • Edit. Only a Draft order can be edited (Edit Job Work Order, button Update, Job work order updated.); the pencil also shows on Approved orders but the server refuses it. The order list search placeholder is Order number, job worker...; the list pages by 10, 25 or 50 and the whole row is clickable.
  • Confirm boxes. Approve: Once approved it can be dispatched to the job worker. Complete: This is the final step and cannot be undone. (only a fully received order can be completed). Cancel Order: All dispatched materials will need to be recalled. This cannot be undone. A completed order cannot be cancelled.
  • Order form messages.Please select a job worker., Please add at least one line item., Each line item must have an item selected and quantity greater than 0., Item rates cannot be negative., Date is required. The remove-row icon is disabled when one line is left. The Project (optional) drop-down lists JWP-… — description with None; the BOM drop-down (Manufacturing only) lists item — vN.
  • What dispatch does. The material moves from the godown you choose to a hidden godown of the job worker, so it stays your stock; the cost is moved from Inventory to Job Work WIP; a delivery challan is created from your delivery-challan number series (and counts against your plan's challan limit). Dispatch is refused if there is nothing left to send or the source godown would go negative and negative stock is off. The cost follows the item's costing method (FIFO lots or the running average).
  • What receive does. Stock moves from the job worker's godown to the godown you choose and the cost moves from WIP back to Inventory. A receipt of zero, or more than is still with the job worker, is refused.
  • What charges do. The bill's lines are moved into the order's WIP cost (before GST; the input GST stays an input credit). The bill must be from the same job worker, not already linked to the order and not void. For FIFO items the charge is absorbed into the returned goods.
  • Wastage. Wastage cost is quantity × rate; Scrap Recovery Value asks only for Scrap (Recoverable). It is refused if it is more than the quantity still with the job worker (a fully received order has none left). Wasted quantity counts towards the order becoming Received.
  • Send to another job worker. The Send to Another Job Worker box (Destination Job Worker, items with a quantity up to what is at the worker, Send Onward) records ITC-04 Table 5(B). A worker cannot send to itself.
  • Cancel after dispatch. Returns the unreceived material to the source godown, reverses the entry and voids the delivery challans; it is refused while a bill is linked (void linked bills first).
  • Cost columns. The server's Net Cost is material + processing − scrap recovery. The order screen also adds wastage, so the order list and the order screen can differ once there is wastage (D-1176).